
Case Studies & Project Gallery
Review verified industrial projects executed by KB Flooring BD across Greater Dhaka, Chittagong, and national export processing zones. Every project is backed by our stamped written warranty.

APEX SPINNING & KNITTING
Textile spinning hall required continuous vibration absorption and a 100% dust-free environment with heavy bobbin trolleys.

BEXIMCO PHARMA BLOCK 3
Grade-B pharmaceutical sterile cleanroom requiring seamless wall coving and extreme chemical resistance against sanitizing agents.

NAVANA TOWER TERRACE
Corporate skyscraper rooftop suffering severe monsoon rainwater seepage into executive offices below.

MEGHNA LOGISTICS DEPOT
High-bay freight distribution depot subjected to 6-ton axle forklift transit and severe concrete dusting.

SQUARE PHARMACEUTICALS PACKAGING
Fast-track packaging line requiring non-slip pedestrian zones and high light reflectivity.

CITY GROUP COLD STORAGE COMPLEX
Deep freezer blast cold room operating at -28°C with thermal shock during defrost steam cleaning.
Ready To Upgrade Your Floor?
Tell us about your space and get a free site visit and written quote. We will measure your concrete, inspect moisture, and recommend the exact chemical system for your operations.
